spacer
CDBL Logo
CDBL Backhoe  
 spacer
Professional Construction Services
CDBL Dozer 6 SE Lee Blvd.
Lawton, OK
580-355-5463
spacer


First United Methodist Church, Altus OK

Owner: First United Methodist Church
Architect: Perry Horacek

Scope of Work:

This is a 23,000 square foot, two-story family activity center. Pre-Engineered structural steel with a brick veneer. It contains a gymnasium with basketball court, classrooms, church offices, and a commercial kitchen. A cantilevered running track is elevated above the gym floor.

 
Back to Projects